|

Build Your Online Product Catalogs?
Product Name: |
Vertical preheater
|
Supply Ability: |
1000000000 |
Related proudcts |
preheater, preheating machine, |
Specifications |
CE&ISO |
Price Term: |
FOB,CIF |
Port of loading: |
Qingdao |
Minimum Order |
1 |
Unit Price: |
$1000 |
|
Vertical Preheater:
1.Simple structure. 2.Save energy. 3.High efficiency.
Vertical preheater:
Product Introduction:
Vertical preheater is one of the main machines for active limestone. It’s mainly used to convey limestone materials to the preheater and evenly preheat them to about 900�making use of high temperature waste (1150� exhausted from the kiln. In the course of preheating, about 30% CaCO3 is decomposed and is pushed into the rotary kiln for combustion by hydraulic pushing rod. It not only saves much time for combustion but also acquires limestone with higher activity degree.
Working Principle:
Raw materials enter into the smoke and material isolation cover from the feeding chamber and are evenly distributed in the annular stacking ***ce between two drums along the cone surface of the central distribution cone. Hot smoke of 900-1000â„?from the rotary kiln goes to the whole section of the annular stacking ***ce through the air inlet. It flows reversely toward the feeding through material layer to achieve full heat transfer. Preheated materials in 600â„?will be pushed to the kiln in turn by pushing rod discharging device to achieve even feeding. After heat transfer, the temperature of the smoke decreases to about 300â„?which will be exhausted to the atmosphere by the smoke exhauster of the electric dust catcher.
Components:
1.Upper feeding system: It mainly includes upper storage bin and lower feeding pipe. The discharging type and structure can ensure safe closeness of feeding. Outer cold air will not float into the preheater and the feeding will be continuous or intermittent using bar valve;
2.Preheater: It’s the most important part for materials to be preheated to about 900� It consists of preheating chamber, suspension device and refractory brick lining (which doesn’t belong to the design and manufacturing of the equipment). Most of the structure are metal components and part of materials adopt heat resistant steel which can work within 1000-1100 |
Company: |
Zhengzhou Xinhai Machinery Co.,ltd
|
Contact: |
Ms. Nancy Lu |
Address: |
Crossing Of Zhongyuan West Rd. And Fumin Rd. |
Postcode: |
450000 |
Tel: |
86-0371-86561505 |
Fax: |
86-0371-86561507 |
E-mail: |
|
|
|
|